Tuesday, 29 May 2012
work experience
Monday 21st:
Installed a heat pump and was there for mostly safety reasons, as Nathan was 8mtrs up on a ladder and needed someone at the bottom of the ladder to keep it stable...
I also finished off the wiring while Nathan cleaned up outside where he had drilled, Nathan was very happy with the standard of work i had completed.
all up i have been with nathan for 7 heatpump installations, and learnt the best way to insert copper wire into junctions.
there was no problem solving with any of these projects, and everything went well, especially with my wiring.
horticulture 28/03/2012
today we wheel barrowed and lay pebbles in the japanese garden.
we also carved our name in to a flat panel, with our names been in our own design.
we also carved our name in to a flat panel, with our names been in our own design.