Wednesday, 14 March 2012

1.we went to the quarry and got rocks.
2.we carried/ moved the rocks to the bonsai room.
3.put wet paper then plastic down in the bonsai room.
4.completed compost bins.
5. we made 2 trips to the quarry and got 1.7 tonnes of rock for the japanese bonsai garden.

                                                                                                                                                                       
what went well: everyone worked together to get the job done.
for example, we all helped each other by lifting 1 side of a rock each.
as a team we seemed to work well for a change because we all had a common goal
of getting the job completed


jamies driving was bludy herendous